HOME
www.EllinwoodUSA.org/
Great Bend/

BankUp,BankDown,TheatreUp

A selection from nearly 5000 photos and movie clips taken

13 February 2012 - Present (13 June 2013)

UNDER CONSTRUCTION
REV.22 June 2013
Each picture on this page has three sizes.
Click on any picture for a larger view.
Click anywhere on it to see that part in the largest view.
Navigate within the largest size or click again to return to the middle size.
Use BACK arrow Back arrow to return to this page.


The maximum page width in this presentation is two pictures.
Modify Page/Zoom % to optimize your viewing.

~ ~ ~ ~ ~


. . . .OUT with the OLD Bank of the West . . .

'OLD' Bank of the West, 12th and Kansas, Great Bend, Kansas
'OLD' Bank of the West, Automated drivethrough, 12th and Kansas, Great Bend, Kansas
12th & KS, Main entrance (NW corner)
12th & KS, Automated drive-thru on right (South)
'OLD' Bank of the West, Drivethrough Exit, 12th and Kansas, Great Bend, Kansas
Exit, 3-lane teller-serviced drive thru,12th and KS (alley view)
Automated drive-thru exit to the alley was through the parking lot directly behind shown parked vehicles.

~ ~ ~ ~ ~
. . . . after IN with the NEW Bank of the West:
'BANK UP'

13 February 2012 This picture series begins with site grading
This picture series begins 13 Februar 2012 with sign announcing new bank coming to site.

6 March 2012 Slab, facing NW from south end of 11th&KS alley
6 March 2012 Bank concrete slap in place


28 March 2012 Bank framing
28 March 2013 Bank wood framing nearing completion


17 April 2012 Insulation and Scaffolding and insulation; stone work begins:

`
17 April 2012 BOW insulation and scoffolding
17 April 2012 BOW insulation and scoffolding


052312 Waiting outside concrete/ 105_2676
061412 Concrete work/ 105_4762
061412 OLD BoW ATM 105_4781
061412 WE'RE MOVING JULY 13 sign on ATM 105_4777
071312 Hanging new BoW Clearance sign 105_8877
071312 Theatre raw materials accumulate 105_ 8883,8884, 8887-8888, 8905


~ ~ ~ ~ ~

'BANK DOWN'
15 August 2012 - Old BoW tear-down in process:
Old BOW teardown in process

082212 Demolition with towers 106_1448
082412 Demolition with new BOW in background 106_1530
082712 BOW seen across cleared lot 106_1623
090513 Theatre begins with more lot clearing
091212 106_2181 Cleared lot with BOW in background, 2185, 2183

 

18 September 2012 First theatre concrete poured

18 September 2012 First concrete coming down chute

18 September 2012 First thetre concrete being worked+

18 September 2012 Preparations for footings

18 September 2012 Footings underway

18 September 2012 Footings underway

18 September 2012 Footings underway 18 September 2012 Footings underway

25 September 2012 Theatre footings poured
25 September 2012  Perimeter concrete poured, kooking south from 12th & Kansas

17 October 2012 Framing theatre steel

17 October 2012 Steel framing underway 17 October 2012 Steel framing underway

 

101912 Framing theatre steel 106_4699
102612 Framing theatre steel 106_5070, 106_5109, 106_5118
110212 Framing theatre steel 106_5317, 106_5329, 106_5336
111212
112012
121112
010913
020413 Inside
042413
042613
042713 First curtain up (Theatre 1)
050313 Outside concrete
6
050613
051513 12th and Kansas signs installed
051613 South sign installed
051913
052513
052813
053013
060113
060313
     
     
 